7 in 7 Challenge Day 6: Greenstone-Mavora Walkway

The Greenstone-Mavora Walkway on Friday December 3rd 2010 is the sixth event over seven days in the 7 in 7 Challenge. It starts at Greenstone Wharf, Lake Wakatipu (reached by launch from Glenorchy) and finishes at Mavora Lakes

Terrain: A mixture of good quality tramping track and 4WD farm track.

Rating: Moderate-Hard. This day is made tough by its length rather than the terrain, which is relatively benign compared to some of the other days. But it's still alpine country and we will need to be prepared for anything.

Event dateFri 03 Dec 2010LocationOtagoDistances52KTypeOff Road
Event websitehttp://runningwildnz.com/Contact organisersContact details

Location Map

The map below shows the approximate location of the start line at Greenstone Wharf, Lake Wakatipu. Participants reach the start line by launch from Glenorchy.

Disclaimer

Event listings are based on information found on the official website and/or from event directors. All information presented is as accurate as possible but is subject to change without notice. Always check with the official event website for up to date information.

Comments

Please check the event website for more information regarding entry fees, start times, course maps, road closures, etc. All comments are subject to moderation and may be deleted without notice.

Listing created06 Jul 2010 Website last checked 15 Apr 2014